| Works Type: | Sewer Lead In | 
| Location: | Raby Road, Gledswood Hills | 
| Value: | $4.2m | 
| Works Involved: | 54.16m of DN150 UPVC main | 
| 974.87m of DN225 UPVC main | |
| 640m of DN225 MPVC main installed by near-horizontal bore | |
| 814.68m of DN300 MPVC main installed by near horizontal bore | |
| Construction of 20 manhole structures ranging from 6m to 14m in depth | |
| Drone video footage of work available at – link | 
 
					
Recent Comments